Can that wall between the kitchen and dining room come out?expand_more
Usually, but not always cheaply. On these houses the question is whether it is carrying roof or floor load and whether a chimney chase runs through it. A beam and proper point loads down to the foundation turn a tidy job into a permitted, engineered one. Have someone establish that before the design is settled.
Do I need a permit if I am only replacing cabinets?expand_more
A like-for-like swap with nothing moving and no new circuits generally does not need a building permit. The moment new circuits are run, a drain is relocated or a wall opens, it does, and the electrical side is permitted separately through L&I. Your contractor should be pulling these under their own registration.
Is the quote I have been given inclusive of sales tax?expand_more
Ask, in writing, because bids here are not consistent about it. Washington charges retail sales tax on the labour as well as the goods, which is not how it works in Oregon and is the usual reason a cross-river comparison stops making sense. On a kitchen the difference is easily a few thousand dollars.
How long will I be without a kitchen?expand_more
For a full remodel, plan on roughly four to six weeks of no working sink once site work starts, with the cabinet lead time sitting in front of that. Households here usually set up the refrigerator, a kettle and a microwave in the dining room and get on with it. Ask for the plumbing outage to be scheduled as one block.
Will my electrical panel need upgrading?expand_more
Sometimes, and it is worth finding out early rather than at rough-in. Older panels on these houses often have no spare capacity for the circuits a modern kitchen requires. If there is room it is a modest line item; if the service itself needs replacing it is a few thousand dollars, and you want that inside the budget rather than arriving as a change order.
Should I buy my own appliances and fittings?expand_more
It often saves money and it shifts responsibility. Anything you supply, you own when it arrives damaged, wrong-sized or late, and the crew waiting on it still needs paying. Agree in writing who orders what, who takes delivery, and what happens to the schedule if your item does not turn up on time.
What will this cost me to use?expand_more
Nothing whatsoever. There is no charge for describing the job, no charge for the quotes that come back, and no fee if you decide to hire one of the contractors. Money only changes hands between you and the builder you choose, and you are free to compare the bids and do nothing at all.
How many remodelers will get in touch?expand_more
Generally two to four. They are selected on the trade, the size of the job and whether they properly cover your area, and no one outside that small group is given your details. Nothing is resold or added to a list.