Can a second bathroom go into my house?expand_more
More often than owners expect, and the limiting factor is drainage rather than space. A waste run needs somewhere to fall to and a way to be vented, so the answer comes from the crawlspace rather than from a floor plan. Ask a contractor to look underneath and price the drainage before you commission any drawings.
Is a tiled shower worth it over a factory unit?expand_more
Tile looks better and lasts for decades provided the membrane behind it was done properly. A good acrylic or solid-surface unit is quicker, cheaper and genuinely easier to keep clean, and there is no shame in it. The choice matters far less than the standard of the installation and the state of what it is being fitted onto.
What about the old galvanised or cast-iron pipework?expand_more
If the walls and floor are open anyway, replacing what you can reach is usually the cheapest it will ever be. Narrowed galvanised supply is why the shower drops when someone runs a tap, and disturbed cast-iron waste occasionally fails outright. Ask for it to be priced as a named option rather than discovered halfway through.
Do I need a permit for a tub-to-shower conversion?expand_more
Normally yes, because the drain moves and the plumbing changes, and the inspection that follows is on your side. Unpermitted bathroom work has a habit of being spotted during a sale, at which point it costs considerably more to resolve than the permit would have.
How do I tell a thorough bid from a cheap one?expand_more
Read the scope, not the total. A sound bid names the waterproofing system, states the tile allowance, says who supplies the fixtures, includes the permit and describes in writing what happens if rot is found. Cheap bids are usually cheap because those lines are absent, and the money reappears later as change orders.
Does the price include Washington sales tax?expand_more
Ask each bidder directly, because it is frequently the entire difference between two quotes that otherwise read alike. Washington applies retail sales tax to construction labour as well as goods, unlike Oregon, and on a bathroom that is a noticeable sum. Get the answer written on the document.
Am I charged anything for using this?expand_more
No, not at any stage. Setting out the project is free, the quotes that come back are free, and hiring one of the contractors costs you nothing extra either. The only bill you will see is the one from the builder you choose, and you are welcome to compare quotes and decide against the whole thing.
How many contractors should I expect to hear from?expand_more
Two to four, picked because they do bathrooms of this size in your part of Cowlitz County. Only those few are given your name and number, and your request is never passed on, sold, or circulated more widely than that.